Title | Students | Year |
---|---|---|
Evaluation and Redesign of Howara Street |
Abedasslam B Farhat Samer H Odeh Izzadeen F Khaleel |
2013 |
Evaluation and Redesign of Storm Water Collection System for Howwara |
Saleh Ahmad Burhan Jaradat |
2013 |
Evaluation and Traffic Management Study for Rafidia Street |
Isam Shaker Bitar Mohammad Hassan Abu Qaoud |
2013 |
Excavation Support Systems in Nablus City |
Ruba Kurdi Ala’a Odeh Suzan Othman Mai Al-Akhras |
2013 |
Faculty of science building in king Khalid university located in Saudi Arabia |
Basel Zakarni Mohammad Kmail Mohammad Al-khaldi |
2013 |
Filter is a system |
Waseem Abbadi Ahmed Al-Khaldi Mosab Bsharat Suliman Bsharat |
2013 |
Financial Risk Management Affecting Building Projects in WB, Contractor’s Perspective |
Alaa Al-Araj Hazza’a Ammori Ahmad Freehat |
2013 |
Foundation Construction On Expansive Soil And Methods Of Improvement |
Azza Yahya Isra’ Labadi Raghad Melhem Neda’ Bozeyeh |
2013 |
Foundation design for high rise building | Faisal Mohammad Hassouna | 2013 |
HARRIS WATER DISTRIBUTION NETWORK |
Tamer Netham Sultan Mousa Ziadeh |
2013 |
Integration of green technologies and practices within An-Najah Engineering faculty building |
Raya Nour Ramz Bustamy |
2013 |
Kinetic Analysis and Design for High Strength Municipal Wastewater |
Ahmad Bitar Osama Khader Ahmad Domaidi |
2013 |
Landslides and Slope Stability |
Riham Abu Zant Azhar Al-Abed Ala’ Touqan Shomoo’ Badawi |
2013 |
Mecca Mall |
Omar Mohammed Nadeem Al-Jallad Nabeeh Isleem |
2013 |
Nablus Cultural Center |
Adnan Ghannam Mohammad Assi Ghassan Zidan Fadi Shahed |
2013 |
Nablus Streetcar |
Mohammad raafat Saed ali Abdelhadi Dweekat |
2013 |
Optimization of rawabi building |
isra Azzam asia hamza rawan barham |
2013 |
Palestine Islamic Bank |
Tayseer Musmar Jameel Qaisi Raid Eid |
2013 |
Prestressed Design Of Blue Sparkler Hotel |
Ahmad Abu Farha Ahmad Marei |
2013 |
project managemnet |
Sameh Halaweh Odai Abu Al-Rub Mohannad Hanbali |
2013 |