[Skip Header and Navigation] [Jump to Main Content]
الصفحة الرئيسية

Secondary Links

  • المراكز
  • وسائل الإعلام
  • نماذج مهمة
  • اتصل بنا

اللغات

  • العربية
  • English

Primary Links

  • الرئيسية
  • عن الكلية
  • الأقسام
  • جوائز الكلية
  • معرض الصور
  • وحدة الجودة
  • الطلاب
الصفحة الرئيسية

Muskat Secondary School Project

السنة الأكاديمية: 
2012
الطلاب: 
Abdulrahman I. Hamdan
, Ezz Eddein B. Dereih
Ahmad M. Mlatat
الملفات: 
application/vnd.openxmlformats-officedocument.presentationml.presentation iconpresentation.pptx

Many engineering projects in Palestine especially the public ones are reported as exceeding their planned time and cost. This project aims to analyze one of those projects to know the reasons of delay. This project is a secondary school located in Qalqilia city and it is called Muskat secondary school. The school consists of four floors. The analysis includes cost estimation of materials, equipments and labors used in the project. Also, scheduling principles are applied to the project to predict the total number of days required to complete it using the most recent computer tools and programs like peramevra. So, to achieve this with real estimation, productivity rates of labors for various works are estimated, here in Palestine, with the most important factors that affect the work quality. Besides, a redesign of structural elements is performed to seek the most economical structural system that achieves the required safety. Moreover, structural conceptual checks are performed on the original design of structural systems to see if they meet the minimum requirements by the codes specified to be used in the design.

©2012 جامعة النجاح الوطنية |كلية الهندسة| صندوق بريد: 7 | نابلس، فلسطين | هاتف: 092345113/2253 | فاكس: (09) 2345982 | بريد الكتروني: [email protected]
[Jump to Top] [Jump to Main Content]