[Skip Header and Navigation] [Jump to Main Content]
Home

Secondary Links

  • Publications
  • Centers
  • Media
  • Important Forms
  • Contact Us

Languages

  • العربية
  • English

Primary Links

  • Home
  • About
  • Programs
  • Faculty Achivements
  • Photo Gallery
  • Quality Unit
  • Students
Home

Water Works For Baqa Al-Sharqyah -Analysis And Re/Design

Academic Year: 
2015
Supervisors: 
Abdel Fattah R. Hasan (Almallah)(Department Head)
Students: 
Boraq Basim Ali
Raghad Ghassan Onnab
Department: 
Civil Engineering
Files: 
application/vnd.openxmlformats-officedocument.presentationml.presentation iconfinal-presntation-gp2.pptx

Baqa al sharqiya is a town rich of ground water, but at the same time it has many problems in the old water distribution network and lack of waste water collection networks also, so to solve these problems analyzing of the exisiting water distribution network and designing of waste water collection network is to be considered in this project.

Water distribution network will be improved by hydraulic analysis considering the population growth after 30 years to determine the demand and achieving adequate amount of water, because the number of residence has increased in the last few years in Baqa Al-sharqyah, and their needs of water have been increased too. As for waste water in baqa al sharqiya, it has been collected by cesspits mostly near residential areas and this is harmful to the environment, so designing a collection network for the town is to overcome most of the waste water problems in this town. 

In this project redesigning the water distribution network and designing the waste water network in Baqa AL-Sharqiya By figuring out the reclamations that needed to upgrade the water network  and to solve the waste water problems and by applying engineering principles using software such as WaterCAD , SewerCAD and ArcGIS to achieve the maximum possible solutions for the existing problems .

The outputs of the project are gathered in figures, plan views, profiles, and tabulated formats, also a bill of quantity was added for the waste water collection network to determine the cost of the network per 1km, the results were concluded and summarized at the end of the project.

 

©2012 An-Najah National University|Faculty Of Engineering | P.O. Box: 7 | Nablus, Palestine | Phone: +970 (9) 2345113 Ext:2253 | Fax: +970 (9) 2345982 | email: [email protected]
[Jump to Top] [Jump to Main Content]