Abstract
Project description:
The aim of the project is to analyze the water network of Tubas and to redesign the
network to meet the requirements for the next 30 years. Moreover, the project aims to
develop a conceptual design sewer network. This is important since lately there have
been a lot of problems in that area related to water services. These problems for
example are the lack of pressure zoning, high percent of losses in the network and lack
of enough water supply. This will be partially done using the WaterCAD software. The
final outcome will be a full design of water Network.
Project tasks:
The main tasks to meet the above mentioned objectives can be summarized in the
following points:
1. As a case of study Tubas City was selected .
2. Collected information and reliable data that we depend on and this was
obtained from Tubas Municipality and Tubas Joint service council
3. Develop a questionnaire to collect further data regarding the study area, the
questionnaire include question to measure the per capita water consumption, the
performance of network, losses. And then analyze the outcome from
questionnaire.
4. Visiting the field is very important to make a good indication about the project ,
5. Work on the collecting data by using GIS and WaterCAD for existing and design
water network
6. Using SewerCAD and GIS (AR