Academic Year:
2011 Students:
Bara Qadomi
Shadi Arar
Taher Deeb
Department:
Civil Engineering Files:
In Palestine, at the western part of the city of Nablus we have a treatment plant under construction to perform an environmentally disposal of sewage in the city of Nablus.
The plant will serve over than 150 thousand people.
And will irrigate 5,000 hectares of agricultural lands.
Chosen facilities
We chose two facilities to design their foundations.
A two stories administration building.
And a settling tank of 36m diameter and a water depth of ( 4-5m).
Our project
Is to design the foundation of two facilities in the treatment plant; these facilities are the administration building which consist of two stories and the final settling tank with 36 m in diameter.