The Best Method For Constructing Schools in Palestine

Academic Year: 
2012
Students: 
Abdelhafeed Mustafa Alia
Fadi Mohammad Jallad
Sameh Mohammad Bdair
Nazem Beesallah Hweidi
Department: 
Civil Engineering
Files: 
application/vnd.openxmlformats-officedocument.presentationml.presentation icongraduation_project_ii_abd.pptx

Project Objectives

1)   

Calculate the total duration and total cost of the original method of construction used to build the school.

2)   

Perform Quantity Surveying on the project; calculate quantities, and ask for Quantities’ Prices.

3)   

Use Primavera® Program to perform Total Duration and Total Cost Calculations.

4)   

Apply the first method, Tunnel Framing Systems, and notice the differences in the Total Cost and Total Duration. Make a comparison between this and the original one.

5)   

Apply the Second method, Pre-Stressed Concrete, and notice the differences in the Total Cost and Total Duration. Make a comparison between this and the original one.