Academic Year:
2011
Supervisors:
Monther Dwaikat Students:
Jameel Abu Baker
Shehadeh Ismail
Rami Abu Baker
Department:
Civil Engineering Files:
1.2 Objectives:
As any project this project aims to achieve its requirements.
The title of this project is “integrative design of school building in Ya’bad, and so this project will be summarized in the following points :
1. Architectural and Environmental Modification in the school design.
2. Structural design of the school.
3. Mechanical Design for (one typical floor)of the school which includes :
** Design of water supply system.
** Design of drainage system.
** Design of heating ventilation and air conditioning systems.
5. Electrical Design for (one typical floor) of the school.