[Skip Header and Navigation] [Jump to Main Content]
الصفحة الرئيسية

Secondary Links

  • المراكز
  • وسائل الإعلام
  • نماذج مهمة
  • اتصل بنا

اللغات

  • العربية
  • English

Primary Links

  • الرئيسية
  • عن الكلية
  • الأقسام
  • جوائز الكلية
  • معرض الصور
  • وحدة الجودة
  • الطلاب
الصفحة الرئيسية

Mechanical System For AL-Rehan Hospital

السنة الأكاديمية: 
2014
الطلاب: 
Mohammad Jitan
Mohammad Shalan
Jehad Odeh
Jehad Zuhd
الملفات: 
application/vnd.openxmlformats-officedocument.presentationml.presentation iconpresentation_of_al-rehan_hospital.pptx

The aim of this project is design mechanical systems for Al-REHAN Hospital includes HVAC system (Heating, Cooling and air Conditioning) also Plumping System ( hot and cold potable water ), Drainage system, Fire fighting system, medical gases and elevators, which is  being built in Al-REHAN Outskirts / Ramallah city / Palestine.

            The entire building needs air conditioning in summer, heating in winter. But, there are many types of systems to provide this purpose, such as Fan coil units with chiller and Boiler, Package unit, VRV and Under Floor Heating. So the project based on design HVAC system with Fan coil units with chiller and Boiler.

            Air conditioning is a combined process that performs many functions simultaneously. It conditions the air, transport and introduces to the conditioned space. It provides heating and cooling from its central plant or rooftop units. Also controls and maintains the temperature, humidity, air movement, air cleanliness, sound level and pressure differential in a space within predetermined limits for the comfort and the health of the occupants of the conditioned space or for the purpose of the product processing.

In addition to the HVAC system, we need water services so plumbing design is required, the availably of water service system inside the building from hot and cold water, these services can be achieved by selecting the right size of piping and fittings.

 

Also medical gases system required to help doctors and Surgeon to make their job as best as possible which they save people life.

 

Moreover, in our project we will consider the firefighting system to keep buildings safe from fire extinguished in its initial stages. There are many systems like wet system and dry system we will choose proper system for the building.

 

 

©2012 جامعة النجاح الوطنية |كلية الهندسة| صندوق بريد: 7 | نابلس، فلسطين | هاتف: 092345113/2253 | فاكس: (09) 2345982 | بريد الكتروني: [email protected]
[Jump to Top] [Jump to Main Content]