[Skip Header and Navigation] [Jump to Main Content]
الصفحة الرئيسية

Secondary Links

  • المراكز
  • وسائل الإعلام
  • نماذج مهمة
  • اتصل بنا

اللغات

  • العربية
  • English

Primary Links

  • الرئيسية
  • عن الكلية
  • الأقسام
  • جوائز الكلية
  • معرض الصور
  • وحدة الجودة
  • الطلاب
الصفحة الرئيسية

Hebron Stadium

السنة الأكاديمية: 
2012
الطلاب: 
Lama Asmah
Amani Mashaqi
الملفات: 
application/vnd.openxmlformats-officedocument.presentationml.presentation iconhebron_stadium_presentation.pptx

*** "Hebron Stadium" building is to be constructed in Hebron. It consists of one story of different vertical elevations, with a total area of (2758.6m2). The area in the first elevation will be used as player’s services area, the main elevation will be used as playground and stadium and the third elevation; the steel truss is a canopy over the stadium.

 ***From a structural point of view the structural elements, footings, columns, beams, slabs and truss will be designed first by hand and then using SAP.

***Detailed sections of the structural elements showing the dimensions and the distribution of steel reinforcement will be introduced using AutoCAD.

©2012 جامعة النجاح الوطنية |كلية الهندسة| صندوق بريد: 7 | نابلس، فلسطين | هاتف: 092345113/2253 | فاكس: (09) 2345982 | بريد الكتروني: [email protected]
[Jump to Top] [Jump to Main Content]