[Skip Header and Navigation] [Jump to Main Content]
Home

Secondary Links

  • Publications
  • Centers
  • Media
  • Important Forms
  • Contact Us

Languages

  • العربية
  • English

Primary Links

  • Home
  • About
  • Programs
  • Faculty Achivements
  • Photo Gallery
  • Quality Unit
  • Students
Home

Rehabilitation Center for disabled

Academic Year: 
2014
Supervisors: 
Fadi A. Fatayer
Students: 
Mohammad Nori
Iyad Hannon
Iyad Abd-Alhafez
Department: 
Building Engineering
Files: 
application/vnd.openxmlformats-officedocument.presentationml.presentation icongraduation_project.pptx

 

The importance of the disables project is due to lots of disabilities and injuries among groups in society as a result of political events. These groups of people need to be integrated into their society through such centers.

The main objectives of this project are: To build an integrated center, such center should have perfect Architectural, Structural, Mechanical, Electrical and Environmental. And to avoid any problems that faced the previous projects during operating and maintenance stage by applying maintainability guideline during the design stage.

In the project we faced various problems such as architectural , structural , electrical and mechanical problems , but we solved these problems as it is  mentioned above at the end of each chapter.

Finally we could maintain and operate the building

©2012 An-Najah National University|Faculty Of Engineering | P.O. Box: 7 | Nablus, Palestine | Phone: +970 (9) 2345113 Ext:2253 | Fax: +970 (9) 2345982 | email: [email protected]
[Jump to Top] [Jump to Main Content]