[Skip Header and Navigation] [Jump to Main Content]
الصفحة الرئيسية

Secondary Links

  • المراكز
  • وسائل الإعلام
  • نماذج مهمة
  • اتصل بنا

اللغات

  • العربية
  • English

Primary Links

  • الرئيسية
  • عن الكلية
  • الأقسام
  • جوائز الكلية
  • معرض الصور
  • وحدة الجودة
  • الطلاب
الصفحة الرئيسية

Regeneration of “Al-Masu’dyia” and Ottoman railway track

السنة الأكاديمية: 
2016
الطلاب: 
ayman dbees

This project aims to revitalize “Al-Masu’dyia” and Ottoman railway track, by a suitable land and buildings use, with preservation to the nature around; to refresh local communities’ economy and protect it from Zionist attacks. The concept was to surround “Al-Masau’dyia” station by a dense Palestinian existence with using the Ottoman rail way track as a historical and environmental path.  The methodology I used was selecting the study area at first (Al-Masu’dyia station and the Ottoman railway track to Balaa’s tunnel), then analyzing the current situation to find the problems and opportunities in the area. Finally, a master plan and detailed designs were proposed.

 

 

يهدف هذا المشروع إلى إعادة إحياء المسعودية وخط سكة الحجاز العثمانية، باستخدام مناسب للأراضي والمباني، مع الحفاظ على طبيعة المنطقة؛ لتنشيط الإقتصاد المحلي للتجمعات المحيطة، وحمايتها من الهجمات الإستيطانية المتكررة. الفكرة الأساسية لهذا المشروع هي الإحاطة بمحطة المسعودية وخط سكة الحجاز العثمانية باستخدام فلسطيني مكثف مع استخدام خط السكة كمسار تاريخي وبيئي. منهجية العمل المستخدمة تبدأ باختيار منطقة الدراسة (محطة المسعودية وخط سكة الحجاز العثمانية حتى نفق بلعا "الخرق")، ثم تحليل معطيات الوضع الراهن للوصول للمشكلات والفرص في المنطقة. في النهاية، تم اقتراح مخطط رئيسي ومخططات تفصيلية مستقبلية للموقع والمنطقة المحيطة.

©2012 جامعة النجاح الوطنية |كلية الهندسة| صندوق بريد: 7 | نابلس، فلسطين | هاتف: 092345113/2253 | فاكس: (09) 2345982 | بريد الكتروني: [email protected]
[Jump to Top] [Jump to Main Content]